• English
Bor PlastikaBor PlastikaBor PlastikaBor Plastika
  • PRODUCTS
    • Production program 1
      • Swimming Pools and Pool Technique
      • Waterproof Collecting Tanks
      • Wastewater Treatment Plants
      • Tele-Supervising Control
      • UV Disinfection and Chemical Treatment
      • Composting
    • Production program 2
      • Light Liquids Separators
      • Securing Devices
      • Drainage Channels
      • Manholes
      • Nidaplast
      • Rainfall Exploitation Devices
    • Production program 3
      • Tanks
      • Pontoons
      • Lagoons
      • Air Treatment
      • Treatment of Industrial Water
  • NEWS
  • TEHNICAL SUPPORT
    • Questionnaires
  • ABOUT US
  • CONTACT

Embedding and Maintance

  • Embedding and Maintance
  • Grease separators (traps)
    • Grease Traps BP FETEX O/AB
    • Grease Traps BP FETEX O/AU
    • Grease Traps BP FETEX O/SN
    • Grease Traps BP FETEX P
  • Oil Separators
    • Oil Separators BP OLEX G O/AB
    • Oil Separators BP OLEX G O/SN
    • Oil Separators BP OLEX G P
    • Oil separators BP OLEX L KF/O/AB
    • Oil separators BP OLEX L/KF/O/SN
    • Oil separators BP OLEX L/KF/P
    • Oil separators BP OLEX M/KF/O/AB
    • Oil separators BP OLEX M/KF/O/SN
    • Oil separators BP OLEX M/KF/P
    • Oil separators BP OLEX XL/KF/O/AB
    • Oil separators BP OLEX XL/KF/O/SN
    • Oil separators BP OLEX XL/KF/P
    • Oil separators BP OLEX SF/O/SN
    • Oil separators BP OLEX SF/O/AB
    • Oil separators BP OLEX M/KF/SF/P
    • Oil separators BP OLEX L/KF/SF/P
    • Oil separators BP OLEX XL/KF/SF/P
  • Oil separators with BYPASS
    • Oil separators BP OLEX M/KF/P With Bypass
Home Light Liquids Separators Embedding and Maintance

EMBEDDING AND MAINTANCE

Instalation of the unit with double surface – type AB

The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 20cm from the border of unit)
Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy ± 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling with concrete. Filling with water and filling back with the concrete must be carried out concurrently until top of the tank.
On the top of the unit is necessary to concrete foundation board in accordance with the load.

Instalation of the unit with one surface – type SN

The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 40cm from the border of unit).
Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy ± 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling the soil works.
Filling with water and filling back the soil works must be carried out concurrently until top of the tank.

Instalation of the unit with square cross section – type P (embedding to the grass area)

The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 40cm from the border of unit).
Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy ± 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling the soil works.
Filling with water and filling back the soil works must be carried out concurrently until top of the tank.

Instalation of the unit with square cross section – type ER (embedding in road way, high level of subsoil water)
The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 20cm from the border of unit)
Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy ± 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling with concrete. Filling with water and filling back with the concrete must be carried out concurrently until top of the tank.
On the top of the unit is necessary to concrete foundation board in accordance with the load.

Maintenance of the oil separators

Visual function check is necessary 1-2 times a month.
The operating staff checks the level of the water surface in all the parts of the separator, the condition of the sludge filters, the quantity of oil substances on a water surface.
This operation can be also done together with a sludge removal carried out by a special authorized company.
The liquidation of the removed oil substances must correspond with regulations concerning the waste liquidation. The oil substances have the character of a dangerous waste according to the law. Sorption filter is necessary to replace with new one.
Immediately after extracting the sludge, the separator must be refilled with water up to the original level.

Maintenance of the grease separators

Visual function check is necessary 1-2 times a month.
The operating staff checks the level of the water surface in all the parts of the separator, the condition of the sludge filters, the quantity of oil substances on a water surface.
This operation can be also done together with a sludge removal carried out by a special authorized company.
The liquidation of the removed oil substances must correspond with regulations concerning the waste liquidation. The oil substances have the character of a dangerous waste according to the law.

Immediately after extracting the sludge, the separator must be refilled with water up to the original level.

Leave a Comment

Cancel reply

Your email address will not be published. Required fields are marked *

PRODUCTS

  • Swimming Pools and Pool Technique
  • Waterproof Collecting Tanks
  • Wastewater Treatment Plants
  • Tele-Supervising Control
  • UV Disinfection and Chemical Treatment
  • Composting
  • Light Liquids Separators
  • Securing Devices
  • Manholes
  • Drainage Channels
  • Rainfall Exploitation Devices
  • Tanks
  • Pontoons
  • Lagoons
  • Air Treatment
  • Treatment of Industrial Water

Bor-plastika New Zealand

111 View Rd | Sunnyvale
Auckland 0612
New Zealand
Tel : +64 21/1931-777
E-Mail: info@bor-plastika.co.nz

*Bor-plastika is not responsible for any errors in the text

BP GROUP

CROATIA

Bor-plastika d.o.o.
Glavna 26, Kneževi Vinogradi
Tel: +385 31/730-881
E-Mail: bor-plastika@bor-plastika.hr

SERBIA

Borplastikaeko d.o.o.
Janka Čmelika 26/101, Novi Sad
Tel: +381 21/6312-299
E-Mail: office@borplastikaeko.rs

BiH

Borplastikaeko d.o.o.
Aleja Alija Izetbegovića 31, Tuzla
Tel: +387 35/279-122
E-Mail: office@borplastikaeko.ba

MONTENEGRO

Borplastikaeko d.o.o.
Kozaračka 21a, 81000, Podgorica
Tel: +382 20/240 780
E-Mail: direktor@borplastikaeko.me

HUNGARY

Bolygó utca 18, Pécs
Tel: +36 72/891-363
E-mail: office@bor-plastika.eu

MACEDONIA

EHI dooel
3 Makedonska brigada bb , Skopje
Tel : +389 22/460-075
E-Mail: contact@ehi.com.mk

Latest News

  • new year

    Christmas and New Year Greetings from BP GROUP

    With pride, we bid farewell to another successful year marked by efforts, dedication, and achievements we have accomplished together.

    21 December, 2023
  • BP GROUP

    Ceremonial opening of our new complex

    Last Friday we have celebrated the official opening of our new complex of buildings for business and production purposes:

    28 March, 2023
  • happy holidays

    Dear Customers, Investors, Suppliers and Business Partners, slowly, but with a smile on our face, we are bringing this challenging but successful 2022 year to an end.

    27 December, 2022
  • new year 2022

    Merry Christmas and happy New Year

    Another year has come to an end and we thank all our partners for their trust! We hope that we will cooperate equally successfully in the coming year.

    3 January, 2022
  • Company Bor-Plastika is engaged in dwastewater treatment plants

    Wastewater treatment plant

    Company Bor-Plastika is engaged in designing, mediation, consulting and manufacturing of wastewater treatment plants.

    23 September, 2021

Our strategic partner


W3Schools


W3Schools


W3Schools


W3Schools


W3Schools

  • Select Language
    • English
    • German
    • French
    • Slovenian
    • Magyar
    • Romanian
  • PRODUCTS
    • Swimming Pools and Pool Technique
    • Waterproof Collecting Tanks
    • Wastewater Treatment Plants
    • Tele-Supervising Control
    • UV Disinfection and Chemical Treatment
    • Composting
    • Light Liquids Separators
    • Securing Devices
    • Drainage Channels
    • Manholes
    • Nidaplast
    • Rainfall Exploitation Devices
    • Tanks
    • Pontoons
    • Lagoons
    • Air Treatment
    • Treatment of Industrial Water
  • News
  • Tehnical Support
    • Questionnaires
  • About Us
  • Contact
Copyright 2015 Bor-plastika d.o.o. | All Rights Reserved
  • About Us
  • Air Treatment
  • Carwash Stations
  • Composting
  • Contact
  • Drainage Channels
  • Embedding in grass area
  • Embedding in grass area and roadway
  • Embedding in roadway
  • Homepage
  • Lagoons
  • Light Liquids Separators
    • Embedding and Maintance
    • Grease separators (traps)
      • Grease Traps BP FETEX O/AB
      • Grease Traps BP FETEX O/AU
      • Grease Traps BP FETEX O/SN
      • Grease Traps BP FETEX P
    • Oil Separators
      • Oil Separators BP OLEX G O/AB
      • Oil Separators BP OLEX G O/SN
      • Oil Separators BP OLEX G P
      • Oil separators BP OLEX L KF/O/AB
      • Oil separators BP OLEX L/KF/O/SN
      • Oil separators BP OLEX L/KF/P
      • Oil separators BP OLEX L/KF/SF/P
      • Oil separators BP OLEX M/KF/O/AB
      • Oil separators BP OLEX M/KF/O/SN
      • Oil separators BP OLEX M/KF/P
      • Oil separators BP OLEX M/KF/SF/P
      • Oil separators BP OLEX SF/O/AB
      • Oil separators BP OLEX SF/O/SN
      • Oil separators BP OLEX XL/KF/O/AB
      • Oil separators BP OLEX XL/KF/O/SN
      • Oil separators BP OLEX XL/KF/P
      • Oil separators BP OLEX XL/KF/SF/P
    • Oil separators with BYPASS
      • Oil separators BP OLEX M/KF/P With Bypass
  • Manholes
  • Nidaplast
  • Pontoons
    • Pontoons
  • Questionnaires
  • Rainfall Exploitation Devices
  • Securing Devices
  • Swimming Pools and Pool Technique
  • Tanks
    • Horizontal Tank Rounded Shape
    • Tanks Square Shape
    • Vertical Tanks Rounded Shape
  • Tele-Supervising Control
  • Treatment of Industrial Water
    • Devices for Preparation of Polyelectrolytes
    • Flotation
    • Mechanical Wastewater Treatment
    • Neutralization and Pipe Mixer
  • UV Disinfection and Chemical Treatment
  • Wastewater Treatment Plants
    • Aerobic Anaerobic Units
      • BP EUROTREAT 300-600 PE
      • BP EUROTREAT 500-5000 B
      • BP EUROTREAT 500-800 PE
      • BP EUROTREAT K O/AB 3-25 PE
      • BP EUROTREAT K O/SN 3-25 PE
      • BP EUROTREAT N 30-150 PE
    • Embedding and Maintance
    • FBR Devices
      • BP EUROTREAT FBR P 51-300 PE
      • BP FBR P 350-1000 PE
    • Microfiltration
      • BP EUROTREAT K ULTRA O/AB 3-25 PE
      • BP EUROTREAT K ULTRA O/SN 3-25 PE
      • BP EUROTREAT N ULTRA 30-150 PE
    • SBR Plants
      • BP EUROTREAT SBR 300–500 PE
      • BP EUROTREAT SBR 600–1000 PE
      • BP EUROTREAT SBR O/AB 4-40 PE
      • BP EUROTREAT SBR O/SN 4-40 PE
      • BP EUROTREAT SBR P 4-250 PE
  • Waterproof Collecting Tanks
  • English
Bor Plastika